The invention provides a railway wagon overhauling production line without a crown block and an overhauling process thereof. The railway wagon overhauling production line comprises an overhauling standard railway track (3), a track switch (4), a bogie replacing station, a damaged part assessment disassembling station, a turnover overhauling station, an overhauling shaping station and a bogie rotating station, wherein the two ends of the overhauling standard railway track (3) are butt-jointed with a wagon overhauling inlet line and a wagon return line, respectively; and two ends of the track switch (4) are connected with the two ends of the overhauling standard railway track (3) through a curve and a switch device, respectively. The railway wagon overhauling production line without the crown block, provided by the invention, is advantaged in that the process layout of the production line is reasonable; the use of the crown block can be avoided in the overhauling production line so that the whole overhauling production line is simple; the overhauling efficiency of the production line is high; and the production line exerts very good market promotion values.
Railway wagon overhauling production line without crown block and overhauling process thereof
2015-11-18
Patent
Electronic Resource
English
Special device for overhauling door of railway freight open wagon
European Patent Office | 2022
|Overhauling operation device for railway overhead line system
European Patent Office | 2020
|Overhauling electric railway rolling stock
Engineering Index Backfile | 1937