Scheme for handling average daily output of eight units repaired in standardized system of repairs; diagram indicates in outline shops and method designed to cover this output on this system; buildings consist of repair and paint shops, containing two tracks each.
Periodical overhauling of steel railway wagons
Engineering
Engineering ; 137 , n 3565
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Engineering Index Backfile | 1901
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1908
Palletization and railway wagons
Engineering Index Backfile | 1950