A method of constructing a building includes constructing a vertical support core of the building, and attaching a climbing rail to an exterior of the vertical support core. The climbing rail includes holes spaced vertically. A first floor plate is constructed around a periphery of the vertical support core, at a ground elevation, and includes at least one connecting rail having vertically spaced holes. A climbing jack is attached to the climbing rail, and moved vertically upward on the climbing rail to raise the first floor plate to a first floor final elevation. The first floor plate is permanently attached to the climbing rail at the first floor final elevation by inserting a pin through aligned holes in the connecting rail and the climbing rail.
L'invention concerne un procédé de construction d'un bâtiment qui comprend la construction d'une partie centrale verticale de support du bâtiment, et la fixation d'un rail d'escalade à l'extérieur de la partie centrale verticale de support. Le rail d'escalade comprend des trous espacés verticalement. Une première plaque de plancher est construite autour d'une périphérie de la partie centrale verticale de support, au niveau d'une élévation au sol, et comprend au moins un rail de liaison ayant des trous espacés verticalement. Un vérin d'escalade est fixé au rail d'escalade, et déplacé verticalement vers le haut sur le rail d'escalade pour soulever la première plaque de plancher jusqu'à une première élévation finale de plancher. La première plaque de plancher est fixée de façon permanente au rail d'escalade au niveau de la première élévation finale de plancher par insertion d'une broche à travers des trous alignés dans le rail de liaison et le rail d'escalade.
METHOD OF CONSTRUCTING A BUILDING, AND A BUILDING CONSTRUCTION SYSTEM THEREFOR
PROCEDE DE CONSTRUCTION DE BATIMENT ET SYSTEME DE CONSTRUCTION DE BATIMENT ASSOCIE
2024-05-21
Patent
Electronic Resource
English
IPC: | E02B HYDRAULIC ENGINEERING , Wasserbau / B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / E02D FOUNDATIONS , Gründungen / E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS / E04C STRUCTURAL ELEMENTS , Bauelemente / E04G SCAFFOLDING , Baugerüste |
METHOD OF CONSTRUCTING A BUILDING, AND A BUILDING CONSTRUCTION SYSTEM THEREFOR
European Patent Office | 2020
|BUILDING CONSTRUCTION SYSTEM AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2020
|Construction device and method for constructing top layer of building
European Patent Office | 2021
|European Patent Office | 2020
|Building module for constructing large floating platform
European Patent Office | 2022
|