A method of constructing a building includes constructing a vertical support core of the building, and attaching a climbing rail to an exterior of the vertical support core. The climbing rail includes holes spaced vertically. A first floor plate is constructed around a periphery of the vertical support core, at a ground elevation, and includes at least one connecting rail having vertically spaced holes. A climbing jack is attached to the climbing rail, and moved vertically upward on the climbing rail to raise the first floor plate to a first floor final elevation. The first floor plate is permanently attached to the climbing rail at the first floor final elevation by inserting a pin through aligned holes in the connecting rail and the climbing rail.

    L'invention concerne un procédé de construction d'un bâtiment qui comprend la construction d'une partie centrale verticale de support du bâtiment, et la fixation d'un rail d'escalade à l'extérieur de la partie centrale verticale de support. Le rail d'escalade comprend des trous espacés verticalement. Une première plaque de plancher est construite autour d'une périphérie de la partie centrale verticale de support, au niveau d'une élévation au sol, et comprend au moins un rail de liaison ayant des trous espacés verticalement. Un vérin d'escalade est fixé au rail d'escalade, et déplacé verticalement vers le haut sur le rail d'escalade pour soulever la première plaque de plancher jusqu'à une première élévation finale de plancher. La première plaque de plancher est fixée de façon permanente au rail d'escalade au niveau de la première élévation finale de plancher par insertion d'une broche à travers des trous alignés dans le rail de liaison et le rail d'escalade.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    METHOD OF CONSTRUCTING A BUILDING, AND A BUILDING CONSTRUCTION SYSTEM THEREFOR


    Weitere Titelangaben:

    PROCEDE DE CONSTRUCTION DE BATIMENT ET SYSTEME DE CONSTRUCTION DE BATIMENT ASSOCIE


    Beteiligte:

    Erscheinungsdatum :

    2024-05-21


    Medientyp :

    Patent


    Format :

    Elektronische Ressource


    Sprache :

    Englisch


    Klassifikation :

    IPC:    E02B HYDRAULIC ENGINEERING , Wasserbau / B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / E02D FOUNDATIONS , Gründungen / E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS / E04C STRUCTURAL ELEMENTS , Bauelemente / E04G SCAFFOLDING , Baugerüste



    METHOD OF CONSTRUCTING A BUILDING, AND A BUILDING CONSTRUCTION SYSTEM THEREFOR

    HOUSTON STEPHEN T / BENVENUTO JOSEPH MICHAEL / STAKHIV YAROSLAV | Europäisches Patentamt | 2020

    Freier Zugriff

    BUILDING CONSTRUCTION SYSTEM AND CONSTRUCTION METHOD THEREFOR

    QU QIANG / TIAN SHICHUAN / DU RENYUAN et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Construction device and method for constructing top layer of building

    WANG SHENG / YE LIN / LIU XIAOYING | Europäisches Patentamt | 2021

    Freier Zugriff

    Detecting Method of Building Exterior Wall's Construction Defect using Flight during or after Constructing Building Exterior Wall

    CHUNG BONG SUK / HWANG KEUM JI / OK JONG HO | Europäisches Patentamt | 2020

    Freier Zugriff

    Building module for constructing large floating platform

    SUN ZHEN / XUE DONGMEI / GU SHIYU et al. | Europäisches Patentamt | 2022

    Freier Zugriff