In a method for the vertical transportation of people and/or material in a building (2) in its construction phase or in a construction site device (1) suitable for performing the method, a climbing formwork device (10), comprising a climbing formwork platform (10.1) and able to be hoisted in steps, is arranged in a currently uppermost region of the building and is used to concrete at least part of a building core (3) of the building (2), wherein an elevator system (15), able to be adjusted to an increasing building height and having an elevator cabin (15.5), is installed in a first elevator shaft (4) of the building (2), wherein a conveying height of this elevator system (15) is intermittently adjusted to a current building height primarily by hoisting a mechanical platform (15.1) comprising an elevator drive machine (15.2) to a higher level and fixing it there, wherein at least the two currently uppermost floors (7.X+6, 7.X+7) are however not able to be reached by the elevator cabin (15.5), wherein a construction elevator (20) is temporarily installed in a second elevator shaft (5) in a currently uppermost region of the building and is attached to the climbing formwork platform (10.1) of the climbing formwork device (10), wherein the construction elevator (20) comprises at least one construction elevator frame (20.1), a construction elevator cabin (20.2) able to be moved vertically in the construction elevator frame and at least two access openings (20.3.1-20.3.6) arranged in the construction elevator frame (20.1) and corresponding to shaft door clearances (5.1.1-5.1.6) in a shaft wall (5.1) of the second elevator shaft (5), and wherein people and/or material, in a first step, are transported to a floor (7.X+1-7.X+2) associated with one of the access openings (20.3.1-20.3.2) of the construction elevator by the elevator system (15) able to be adjusted to the building height and, in a second step, are transported from this floor to a floor (7.X+3-7.X17) situated in the currently uppermost region of the building (2) or to the climbing formwork platform (10.1) by the construction elevator (20).


    Access

    Download


    Export, share and cite



    Title :

    Method for operating a construction site device, and construction site device


    Contributors:

    Publication date :

    2023-06-22


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B66B Aufzüge , ELEVATORS / E04G SCAFFOLDING , Baugerüste



    METHOD FOR OPERATING A CONSTRUCTION SITE DEVICE AND CONSTRUCTION SITE DEVICE

    STUDER CHRISTIAN / BIZZOZERO GABRIELE / SIMMONDS OLIVER et al. | European Patent Office | 2020

    Free access

    Method for operating a construction site device and construction site device

    STUDER CHRISTIAN / BIZZOZERO GABRIELE / SIMMONDS OLIVER et al. | European Patent Office | 2024

    Free access

    METHOD FOR OPERATING A CONSTRUCTION SITE DEVICE AND CONSTRUCTION SITE DEVICE

    STUDER CHRISTIAN / BIZZOZERO GABRIELE / SIMMONDS OLIVER et al. | European Patent Office | 2022

    Free access

    CONSTRUCTION SITE MANAGEMENT DEVICE, OUTPUT DEVICE, AND CONSTRUCTION SITE MANAGEMENT METHOD

    ONISHI YOSHIYUKI / KANOU SHINYA / KURODA KYOHEI et al. | European Patent Office | 2020

    Free access

    Construction site management device and construction site management system

    KATO SEIYA / WATANABE HIROSHI / EGAWA EIJI et al. | European Patent Office | 2023

    Free access