FOSTER Wheeler Energy and Air Products, in a joint venture, have been awarded a contract for the Nitrogen and Dry Air systems for the European Transonic Windtunnel (ETW), now under construction in Cologne. The total cost of the Nitrogen and Dry Air systems is anticipated to be around DM.55 million (£18.9m.).


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    European Transonic Windtunnel Project


    Published in:

    Publication date :

    1990-12-01


    Size :

    2 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English



    European Transonic Windtunnel

    Online Contents | 2007


    Status of the European Transonic Windtunnel (ETW)

    Bouis, X. / Deutschen Gesellschaft fur Luft- und Raumfahrt eV | British Library Conference Proceedings | 1993