FOSTER Wheeler Energy Ltd. and Air Products (UK) Limited, in a joint project led by Foster Wheeler, have mechanically completed their £28 million contract for the Nitrogen and Dry Air systems on the DM 666 million European Transonic Windtunnel (ETW), now nearing the end of its construction phase in Cologne.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Mechanical Completion on Schedule at European Transonic Windtunnel



    Publication date :

    1993-04-01


    Size :

    2 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English




    European Transonic Windtunnel

    Online Contents | 2007


    European Transonic Windtunnel Project

    Emerald Group Publishing | 1990



    Status of the European Transonic Windtunnel (ETW)

    Bouis, X. / Deutschen Gesellschaft fur Luft- und Raumfahrt eV | British Library Conference Proceedings | 1993