IT was in 1947 that we first had the privilege of seeing the SE-2010 Armagnac under construction and we were then greatly impressed by the courage and determination of all concerned, who were embarking on the ambitious project of building a production series of 70-ton air liners before testing a prototype. Since our previous article—which dealt in some detail with the whole of the manufacturing methods being employed at Toulouse, Marseilles and Paris, where, because of accommodation difficulties, the various components were being built—the work has gone steadily ahead until a production line exists for the first fifteen airframes.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Progress with the Aérosudest Armagnac


    Subtitle :

    Some Points Noted by the Technical Editor During a Visit to Toulouse with Details of an Unusual Method of Static Testing


    Published in:

    Publication date :

    1950-11-01


    Size :

    5 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English



    Progress with rotodyne

    Engineering Index Backfile | 1956


    Progress with SATCO

    Engineering Index Backfile | 1962


    Progress with Orpheus

    Engineering Index Backfile | 1957


    Progress with rotodyne

    Engineering Index Backfile | 1956


    Progress with P.1.

    Engineering Index Backfile | 1957