DURING recent years many airlines have realised that overhaul time controls alone have had little success in controlling failure frequency. Considerable effort has subsequently been devoted to identifying and continuing those scheduled maintenance activities which are effective in protecting reliability characteristics, and identifying and discontinuing those scheduled maintenance activities which are ineffective in controlling reliability characteristics.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Planning and operational aspects of “on condition” philosophies


    Contributors:


    Publication date :

    1972-03-01


    Size :

    3 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English



    Glare Design Aspects and Philosophies

    Vermeeren, C.A.J.R. / Beumler, T. / De Kanter, J.L.C.G. et al. | Tema Archive | 2003


    Decision diagram approach to “on condition” philosophies

    NOWLAN, F.S. | Emerald Group Publishing | 1972


    Changing philosophies

    Online Contents | 1994


    Ground System and Operational Philosophies for Space Stations and Orbiting Facilities

    Oetting, M. | British Library Conference Proceedings | 1998