DURING recent years many airlines have realised that overhaul time controls alone have had little success in controlling failure frequency. Considerable effort has subsequently been devoted to identifying and continuing those scheduled maintenance activities which are effective in protecting reliability characteristics, and identifying and discontinuing those scheduled maintenance activities which are ineffective in controlling reliability characteristics.
Planning and operational aspects of “on condition” philosophies
Aircraft Engineering and Aerospace Technology ; 44 , 3 ; 26-28
01.03.1972
3 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Glare Design Aspects and Philosophies
Tema Archiv | 2003
|Decision diagram approach to “on condition” philosophies
Emerald Group Publishing | 1972
|Online Contents | 1994
Ground System and Operational Philosophies for Space Stations and Orbiting Facilities
British Library Conference Proceedings | 1998
|