Cause and remedy for pitting and corrosion of locomotive boiler tubes and sheets, with special reference to status of embrittlement investigations; types of lime and soda ash equipment in treated water; water conditions affecting extension of locomotive washout periods.
Report of committee XIII -- Water service, fire protection and sanitation
Am Ry Eng Assn -- Proc
1936
33 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Report of committee XIII -- Water service, fire protection and sanitation
Engineering Index Backfile | 1935
Report of committee XIII -- Water service, fire protection and sanitation
Engineering Index Backfile | 1936
Report of committee XIII -- Water service, fire protection and sanitation
Engineering Index Backfile | 1937
Report of committee XIII -- Water service, fire protection and sanitation
Engineering Index Backfile | 1937
Report of committee XIII -- Water service, fire protection and sanitation
Engineering Index Backfile | 1937