Special seagoing suction dredge is used in shipping channel work in Orinoco River, Venezuela; dredge has 240 ft boom that extends outward from side of ship; boom carries two 32 in. discharge lines; for traveling, boom swings around parallel to ship; 16,000 ton tanker was converted to dredge in Japanese shipyard.
Converted tanker opens channel
Construction Methods Equipment
Construction Methods and Equipment ; 42 , n 3
1960
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arctic opens up to tanker trades
British Library Online Contents | 2007
New era opens in tanker construction
Engineering Index Backfile | 1948
GAS SHIPPING - Arctic opens up to tanker trades
Online Contents | 2007
DEPARTMENTS - INTERNATIONAL BEAT - Tanker contract opens European fault lines.
Online Contents | 2001
Motions of converted T-2 tanker USNS mission capistrano (Tag 162)
Engineering Index Backfile | 1963
|