Illustrations and brief text describing concrete work now approaching completion, on rail and road bridge over Limpopo River, near Messina; bridge will be 1600 ft. long and 22 ft. wide, allowing 18 ft. roadway and single line of 3 ft. 6 in. railway; provides new transportation entrance into Southern Rhodesia; funds supplied by Beit Trust Fund.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Progress of the Limpopo bridge


    Additional title:

    S. African Min. Eng. Jl



    Publication date :

    1928


    Remarks:

    7 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Multiple use of water and water productivity of communal small dams in the Limpopo Basin, Zimbabwe

    Senzanje, A. / Boelee, E. / Rusere, S. | British Library Online Contents | 2008


    Progress at site of Quebec bridge

    Engineering Index Backfile | 1914


    Progress report on bridge instrumentation and monitoring

    Hunt, V.J. / Levi, A. / Sobecks, B. et al. | Tema Archive | 1995


    Fifty years of progress in bridge engineering

    Steinman, D.B. | Engineering Index Backfile | 1931