Illustrations and brief text describing concrete work now approaching completion, on rail and road bridge over Limpopo River, near Messina; bridge will be 1600 ft. long and 22 ft. wide, allowing 18 ft. roadway and single line of 3 ft. 6 in. railway; provides new transportation entrance into Southern Rhodesia; funds supplied by Beit Trust Fund.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Progress of the Limpopo bridge


    Weitere Titelangaben:

    S. African Min. Eng. Jl



    Erscheinungsdatum :

    1928


    Anmerkungen:

    7 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Multiple use of water and water productivity of communal small dams in the Limpopo Basin, Zimbabwe

    Senzanje, A. / Boelee, E. / Rusere, S. | British Library Online Contents | 2008


    Progress at site of Quebec bridge

    Engineering Index Backfile | 1914


    Progress report on bridge instrumentation and monitoring

    Hunt, V.J. / Levi, A. / Sobecks, B. et al. | Tema Archiv | 1995


    Fifty years of progress in bridge engineering

    Steinman, D.B. | Engineering Index Backfile | 1931