Renewal of railway bridge at Birmingham, over Western Region tracks, British Railways; bottom chord of single truss was so heavily corroded as to require strengthening and decking had to be replaced; tension in chord was reduced by prestressing load of 230 tons applied through eight Macalloy bars of 1 in. diam. (see also Engineering v 181 n 4707 May 25 1956 p 408-9)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Railway bridge repair


    Additional title:

    Engineer


    Published in:

    Engineer ; 201 , n 5229


    Publication date :

    1956


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Railway bridge repair

    Engineering Index Backfile | 1956


    Removable railway bridge

    Engineering Index Backfile | 1931


    Railway repair shop organization

    Gardner, Henry | Engineering Index Backfile | 1915


    Repair of railway wagons

    Engineering Index Backfile | 1929


    Electric railway repair shops

    Merriam, H.P. | Engineering Index Backfile | 1895