Renewal of railway bridge at Birmingham, over Western Region tracks, British Railways; bottom chord of single truss was so heavily corroded as to require strengthening and decking had to be replaced; tension in chord was reduced by prestressing load of 230 tons applied through eight Macalloy bars of 1 in. diam. (see also Engineering v 181 n 4707 May 25 1956 p 408-9)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Railway bridge repair


    Weitere Titelangaben:

    Engineer


    Erschienen in:

    Engineer ; 201 , n 5229


    Erscheinungsdatum :

    1956


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Railway bridge repair

    Engineering Index Backfile | 1956


    The raising and repair of the railway bridge at Houplines

    Sinauer, E.M. | Engineering Index Backfile | 1919


    Moving railway bridge

    Roe, D.B. | Engineering Index Backfile | 1950


    Removable railway bridge

    Engineering Index Backfile | 1931


    The railway bridge

    Engineering Index Backfile | 1925