Dock designed and constructed by DeLong Engineering Co, New York, utilizes DeLong Airjack, and consists of prefabricated sections towed to site where entire construction, averaging four months, can be accomplished without land facilities and for which small field organization are flown in; Orinoco Mining Co dock is 82 ft by 1130 ft, and similar in principle to initial installation for air base at Thule, Greenland.
Prefabricated pier on Orinoco river
Dock Harbour Authority
Dock and Harbour Authority ; 33 , n 388
1953
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bantam ore ship for Orinoco river
Engineering Index Backfile | 1956
Transportation and turnover device for prefabricated pier column
European Patent Office | 2023
|Prefabricated bridge pier stud hoisting device and hoisting method
European Patent Office | 2020
|Prefabricated vase pier formwork hoisting device and hoisting method
European Patent Office | 2024
|Integral hoisting device for prefabricated pier column steel bars
European Patent Office | 2024
|