Interim report on study covering plan for overall maintenance of fleet of ocean-going tankers; optimum period, between drydockings, solely for bottom cleaning and painting is examined; taken in conjunction with system of planned maintenance by ship's staff, combined with continuous survey of machinery, objective is to extend periods between withdrawal of vessel from service, for shipyard overhaul, possibly to maximum of 24 mo, during first 8 yr life of vessel. From paper before Inst Mar Engrs, Jan 22 1963.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Application of planned maintenance to steam turbine tankers


    Additional title:

    Shipbldg Shipg Rec


    Contributors:
    Scott, J. (author) / Vickerstaff, H. (author)

    Published in:

    Publication date :

    1963


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Turbine-electric drive tankers

    Wasmund, J.A. | Engineering Index Backfile | 1943


    Turbine-electric drive tankers

    Wasmund, J.A. | Engineering Index Backfile | 1943


    Enclosed steam deck machinery for tankers

    Engineering Index Backfile | 1958


    Two new geared-turbine tankers

    Engineering Index Backfile | 1943


    Performance of geared turbine tankers

    Engineering Index Backfile | 1934