Interim report on study covering plan for overall maintenance of fleet of ocean-going tankers; optimum period, between drydockings, solely for bottom cleaning and painting is examined; taken in conjunction with system of planned maintenance by ship's staff, combined with continuous survey of machinery, objective is to extend periods between withdrawal of vessel from service, for shipyard overhaul, possibly to maximum of 24 mo, during first 8 yr life of vessel. From paper before Inst Mar Engrs, Jan 22 1963.
Application of planned maintenance to steam turbine tankers
Shipbldg Shipg Rec
Shipbuilding and Shipping Record ; 101 , n 5
1963
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Turbine-electric drive tankers
Engineering Index Backfile | 1943
|Turbine-electric drive tankers
Engineering Index Backfile | 1943
|Enclosed steam deck machinery for tankers
Engineering Index Backfile | 1958
Two new geared-turbine tankers
Engineering Index Backfile | 1943
Performance of geared turbine tankers
Engineering Index Backfile | 1934