Fully equipped garage and workshops with adequate administrative, canteen and welfare facilities; parking bay building has modern external appearance; roof beams, with clear span of 97 ft 6 in. over three parking bays, were cast in position; 8-in. concrete floors are laid with expansion joints on 16-in. underbed of red shale; vehicle movement in refueling area is controlled by overhead lights.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Sheffield's three-stage 150-bus depot


    Additional title:

    Bus Coach


    Published in:

    Bus and Coach ; 25 , n 293


    Publication date :

    1953


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Sheffield's new tramcar

    Engineering Index Backfile | 1946


    Sheffield's sewage works railways

    Booth, A. J. / Industrial Railway Society | TIBKAT | 1986


    Rear-engined buses speed Sheffield's traffic

    Baggaley, P.D. | Engineering Index Backfile | 1965


    Tinsley and the modernisation of Sheffield's railways

    Booth, Chris / Fisher, Alex | SLUB | 2019