Fully equipped garage and workshops with adequate administrative, canteen and welfare facilities; parking bay building has modern external appearance; roof beams, with clear span of 97 ft 6 in. over three parking bays, were cast in position; 8-in. concrete floors are laid with expansion joints on 16-in. underbed of red shale; vehicle movement in refueling area is controlled by overhead lights.
Sheffield's three-stage 150-bus depot
Bus Coach
Bus and Coach ; 25 , n 293
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Sheffield's first tram-replacement garage
Engineering Index Backfile | 1958
Engineering Index Backfile | 1946
Sheffield's sewage works railways
TIBKAT | 1986
|Rear-engined buses speed Sheffield's traffic
Engineering Index Backfile | 1965
|