Fully equipped garage and workshops with adequate administrative, canteen and welfare facilities; parking bay building has modern external appearance; roof beams, with clear span of 97 ft 6 in. over three parking bays, were cast in position; 8-in. concrete floors are laid with expansion joints on 16-in. underbed of red shale; vehicle movement in refueling area is controlled by overhead lights.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Sheffield's three-stage 150-bus depot


    Weitere Titelangaben:

    Bus Coach


    Erschienen in:

    Bus and Coach ; 25 , n 293


    Erscheinungsdatum :

    1953


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Sheffield's new tramcar

    Engineering Index Backfile | 1946


    Sheffield's first tram-replacement garage

    Engineering Index Backfile | 1958


    Sheffield's new tramcar

    Engineering Index Backfile | 1946


    Sheffield's sewage works railways

    Booth, A. J. / Industrial Railway Society | TIBKAT | 1986


    Rear-engined buses speed Sheffield's traffic

    Baggaley, P.D. | Engineering Index Backfile | 1965