Works include construction of two docks with up-to-date equipment, lengthening of quay wall for ore and coal transporter bridges, construction of finger mooring jetty for large tankers, construction of canal dock of considerable dimensions (4 3/4 mi long), extending north of existing port, and construction of world's largest sea lock, as junction between Canal Dock and River Scheldt; short description is given of each of these works, while reference is also made to some specific difficulties encountered as works were carried out.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Port of antwerp -- Extension works connected with ten year scheme


    Additional title:

    Instn Civ Engrs -- Proc


    Contributors:


    Publication date :

    1967


    Size :

    18 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Extension of harbor works in Port of Antwerp

    Bonnet, L. | Engineering Index Backfile | 1926


    Extension of the port of Antwerp

    Engineering Index Backfile | 1906


    Extension and modernization of port of Antwerp

    Dekesel, L. | Engineering Index Backfile | 1965


    The extension of the port of Antwerp

    Engineering Index Backfile | 1898


    Port of Antwerp

    Engineering Index Backfile | 1933