Works include construction of two docks with up-to-date equipment, lengthening of quay wall for ore and coal transporter bridges, construction of finger mooring jetty for large tankers, construction of canal dock of considerable dimensions (4 3/4 mi long), extending north of existing port, and construction of world's largest sea lock, as junction between Canal Dock and River Scheldt; short description is given of each of these works, while reference is also made to some specific difficulties encountered as works were carried out.
Port of antwerp -- Extension works connected with ten year scheme
Instn Civ Engrs -- Proc
1967
18 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Extension of harbor works in Port of Antwerp
Engineering Index Backfile | 1926
|Extension of the port of Antwerp
Engineering Index Backfile | 1906
Extension and modernization of port of Antwerp
Engineering Index Backfile | 1965
|The extension of the port of Antwerp
Engineering Index Backfile | 1898
Engineering Index Backfile | 1933