On basis of 50 replies to questionnaire considerable information has been accumulated and is presented here as concensus; preparatory work includes elimination or correction of drainage problems, renewal of switch and cross ties, unloading ballast, road crossing rehabilitation, and preparation for unloading at road crossing and bridges; rail length should be adjusted at "mean" temperature; continuous welded rail should be tailored in field; where possible eliminate all joints in continuous-welded-rail territory; newly laid rail should be surfaced and lined as soon as practicable.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Continuous welded rail -- Installation and maintenance


    Additional title:

    Ry Track Structures


    Contributors:

    Published in:

    Publication date :

    1967


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Continuous-welded rail

    Magee, G.M. | Engineering Index Backfile | 1960


    The electrically welded continuous rail

    Eyre, Richard | Engineering Index Backfile | 1896


    CONTINUOUS WELDED RAIL CARRYING APPARATUS

    SUNG CHI YUL | European Patent Office | 2016

    Free access

    Continuous welded rail -- Extended abstract

    Gillett, H.W. | Engineering Index Backfile | 1939


    Continuous Welded Rail on Bridges

    Bruestle, K. / American Railway Bridge and Building Association | British Library Conference Proceedings | 1996