New bridge at Hamerten near Stendal, designed to meet requirements of heaviest locomotives and rolling stock; it is of overhead trussed-girder type and largest span has length of 106 m. while maximum girder system height is 15 m.; all main girders and bracings are made of steel no. 48 of German State Railway Standards of 1924; material has breaking strength of 45 to 48 kilos, per sq. mm. (brief translated abstract) (See also Kruppsche Monatshefte, vol. 7, Nov. 1926, pp. 197-203, 12 figs)
The new double-track railway bridge over the Elbe river
Uber den Bau der neuen zweigleisigen Eisenbahnbrucke uber die Elbe bei Hamerten
Engineer ; 142
1926
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new double-track railway bridge over the Elbe river
Engineering Index Backfile | 1926
|Railway bridge over the Elbe at Meissen
Engineering Index Backfile | 1925
|The new railway bridge over the elbe at lobositz
Engineering Index Backfile | 1898
|Railway bridge over Colorado river
Engineering Index Backfile | 1949
Railway bridge over Colorado river
Engineering Index Backfile | 1948