Modification of permanent way of metal girder bridge on river Mella of Brescia-Iseo-Edolo railway, in service since 1884, in order to adapt it to diesel electric locomotives; wooden members replaced with U-shaped iron members anchored by means of welded sheet steel straps to longitudinal members of span; excellent operation of new structure noted.
New track structure for bridges without ballast
Nuova struttura di binario per ponti senza massicciata
Ingegneria Ferroviaria ; 14 , n 7-8 ; p 677-682
1959
6 pages
Article (Journal)
Italian
© Metadata Copyright Elsevier B. V. All rights reserved.
Track without ballast on viaduct in delft
| Engineering Index Backfile | 1967
| Engineering Index Backfile | 1908
Modern track needs good ballast
| Engineering Index Backfile | 1918
Boosting ballast for better track
| IuD Bahn | 2012