Facility for transport of magnetic ore from mine which lies about 1 1/ 2 mi from coast, to sea; 2400-m long monocable ropeway with transport capacity of 50 ton/hr, runs from mine loading station to ground level storage dump; hoppers and conveyers feed into second ropeway of bicable type which has capacity of 200 ton/hr; ropeway is 550 m long from reloading station to discharge terminus which with loader is erected on concrete tower in sea.
Maritime aerial ropeway in open sea at Marbella, Spain
Dock Harbour Authority
Dock and Harbour Authority ; 39 , n 462
1959
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|The Tilmanstone aerial ropeway
Engineering Index Backfile | 1930
The Tilmanstone aerial ropeway
Engineering Index Backfile | 1930