Central of Georgia provides special indicator for switching moves that reduces delays; operator controls trains in section formerly divided into three automatic blocks. (See also Ry. Signaling, vol. 18, no. 5, May 1925, pp. 190-191, 1 fig)
Train orders eliminated by signals on busy single track
Ry. Age
Railway Age ; 78 , n 21
1925
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Train orders eliminated by signals on busy single track
Engineering Index Backfile | 1925
|Single track operation without train orders
Engineering Index Backfile | 1920
|34 train stops eliminated daily by interlocking
Engineering Index Backfile | 1936
C.T.C. solves operating problem on busy single-track line
Engineering Index Backfile | 1948
Ellicott Stays Busy With Worldwide Dredge Orders
British Library Online Contents | 1995