Central of Georgia provides special indicator for switching moves that reduces delays; operator controls trains in section formerly divided into three automatic blocks. (See also Ry. Age vol. 78, no. 21, Apr. 25 1925 pp. 1021-1022, 2 figs)
Train orders eliminated by signals on busy single track
Ry. Signaling
Railway Signaling ; 18 , n 5
1925
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Train orders eliminated by signals on busy single track
Engineering Index Backfile | 1925
|Single track operation without train orders
Engineering Index Backfile | 1920
|34 train stops eliminated daily by interlocking
Engineering Index Backfile | 1936
C.T.C. solves operating problem on busy single-track line
Engineering Index Backfile | 1948
Ellicott Stays Busy With Worldwide Dredge Orders
British Library Online Contents | 1995