Fast method of construction of new railroad bridge over Red River, Tennessee by Louisville and Nashville in place where it was demolished as result of coal train derailment; traffic was restored 30 days after deck-girder approach was demolished on single-track line; bridge was 850 ft long and 102 ft high, comprised of two deck trusses, 154 ft long, flanked on each side by steel viaduct. (See also Ry Age v 160 n 23 June 13 1966 p 19-21)
How L and N quickly rebuilt derailment-wrecked bridge
Ry Track Structures
Railway Track and Structures ; 62 , n 6
1966
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
How L and N quickly rebuilt derailment-wrecked bridge
Engineering Index Backfile | 1966
Rebuilding a Wrecked railroad bridge at Easton, Pa
Engineering Index Backfile | 1904
Quickly-assembled anti-derailment electric hoist for crane trolley
European Patent Office | 2022
|Engineering Index Backfile | 1916
|Halifax pier shed quickly rebuilt to meet winter service demands
Engineering Index Backfile | 1934