At plant, several of overhead railways, of various lengths and capacities, travel throughout assembly areas on more than 29 mi of crane tracks; seven separate systems included in this trackage covering various departments; system illustrated and described.
Overhead railways speed bomber parts handling at willow run
Steel
Steel ; 113 , n 11
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
Expressways to serve Willow Run bomber plant
Engineering Index Backfile | 1944
|Decentralization of willow run bomber plant results in volume output
Engineering Index Backfile | 1944
|New overhead conveyor system in Martin Bomber plant
Engineering Index Backfile | 1942
Framework of overhead railways
Engineering Index Backfile | 1897