At plant, several of overhead railways, of various lengths and capacities, travel throughout assembly areas on more than 29 mi of crane tracks; seven separate systems included in this trackage covering various departments; system illustrated and described.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Overhead railways speed bomber parts handling at willow run


    Weitere Titelangaben:

    Steel


    Beteiligte:
    Doerger, E.H. (Autor:in)

    Erschienen in:

    Steel ; 113 , n 11


    Erscheinungsdatum :

    1943


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Willow run bomber plant

    Engineering Index Backfile | 1942


    Expressways to serve Willow Run bomber plant

    Coons, H.C. | Engineering Index Backfile | 1944


    Decentralization of willow run bomber plant results in volume output

    Warner, Jr., E.L. | Engineering Index Backfile | 1944