How contractors are ripping 80-lb rails from heavily traveled thoroughfares with minimum interference of traffic; method is rapid and low in cost; damage to pavement is unusually light; description of frame rail puller.
Methods used in removing 160 miles of steel rails from Seattle Streets
Pac Bldr Engrs
Pacific Builder and Engineer ; 49 , n 9
1943
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Removing unused rails from streets of Seattle and Mobile
Engineering Index Backfile | 1945
Seattle rids pavements of steel rails
Engineering Index Backfile | 1944
Continuous rails in unpaved streets
Engineering Index Backfile | 1897
Transporting welded rails 890 miles
Engineering Index Backfile | 1954
|Transporting welded rails 890 miles
Engineering Index Backfile | 1953