Methods of rail removal and repaying employed in removing rail skid hazard described and illustrated; rails 35 yr old broke easily, presumably from crystallization; repaving costs had to be kept low; rail removal has effect of adding one or more lanes to traffic capacity of streets.
Seattle rids pavements of steel rails
Eng News-Rec
Engineering News-Record ; 132 , n 6
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Electronic sound system rids platforms of seagulls
Tema Archive | 1996
A Summary and Final Report of the RIDS Program
NTIS | 1976
Methods used in removing 160 miles of steel rails from Seattle Streets
Engineering Index Backfile | 1943
|Seattle converts its transportation system from rails to rubber
Engineering Index Backfile | 1944
|Removing unused rails from streets of Seattle and Mobile
Engineering Index Backfile | 1945