Increase in services required improved land facilities for quick traffic turnover, new berth and extended pier; operational research and work study were used for traffic flow diagram and cost design of structures; new terminal has been designed basically around four berths although provision of loading bridge in No. 4 berth only is included in first stage of work; when complete, all berths will be served by common reception and customs facilities, thus economizing in staff required to operate terminal.
Dover car ferry terminal -- New facilities for increased traffic
Dock Harbour Authority
Dock and Harbour Authority ; 46 , n 542
1965
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
Engineering Index Backfile | 1953
Proposed car ferry terminal at Dover
Engineering Index Backfile | 1949
Engineering Index Backfile | 1958
Car ferry for Ostend-Dover service
Engineering Index Backfile | 1965