Increase in services required improved land facilities for quick traffic turnover, new berth and extended pier; operational research and work study were used for traffic flow diagram and cost design of structures; new terminal has been designed basically around four berths although provision of loading bridge in No. 4 berth only is included in first stage of work; when complete, all berths will be served by common reception and customs facilities, thus economizing in staff required to operate terminal.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Dover car ferry terminal -- New facilities for increased traffic


    Weitere Titelangaben:

    Dock Harbour Authority


    Beteiligte:

    Erschienen in:

    Erscheinungsdatum :

    1965


    Format / Umfang :

    5 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Dover car ferry terminal

    Engineering Index Backfile | 1953


    Dover car ferry terminal

    Engineering Index Backfile | 1953


    Dover car ferry terminal

    Engineering Index Backfile | 1953


    Proposed car ferry terminal at Dover

    Engineering Index Backfile | 1949


    Dover train ferry

    Engineering Index Backfile | 1936