Improvements to Calumet-Sag Channel connecting Chicago Sanitary and Ship Canal and Calumet River have been completed; barge tows four times larger than present tows will be able to move freely through channel to connect with deep draft navigation at Lake Calumet; first phase of project consists of utility relocation, dredging, relocation of railway and highway bridges, and construction of navigation lock.
Calumet-Sag navigation project
ASCE -- Proc (J Waterways Harbors Div)
1958
12 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
Engineering Index Backfile | 1893
Calumet and Arizona sulphuric-acid plant
Engineering Index Backfile | 1918
|Swing bridge over the little Calumet river
Engineering Index Backfile | 1916
Bonding and other track improvements on the calumet electric railway
Engineering Index Backfile | 1906