Improvements to Calumet-Sag Channel connecting Chicago Sanitary and Ship Canal and Calumet River have been completed; barge tows four times larger than present tows will be able to move freely through channel to connect with deep draft navigation at Lake Calumet; first phase of project consists of utility relocation, dredging, relocation of railway and highway bridges, and construction of navigation lock.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Calumet-Sag navigation project


    Weitere Titelangaben:

    ASCE -- Proc (J Waterways Harbors Div)


    Beteiligte:


    Erscheinungsdatum :

    1958


    Format / Umfang :

    12 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Towboat Calumet

    Engineering Index Backfile | 1949


    The calumet electric railway

    Engineering Index Backfile | 1893


    Calumet and Arizona sulphuric-acid plant

    De Kalb, Courtenay | Engineering Index Backfile | 1918


    Swing bridge over the little Calumet river

    Engineering Index Backfile | 1916