Study of plant for 46,000 dw tanker covers 14 combinations of steam pressure and temperature, and two alternate feed-heating cycles; data are included for fuel consumption, initial and operating costs, change in cargo carrying capacity, and operating income.
Cycle and economic studies for 25,000-maximum-SHP steam power plant for single-screw tanker installation
Soc Naval Architects Mar Engrs -- Paper
Society of Naval Architects and Marine Engineers -- Meeting ; 1958 Steam turbine
1958
20 pages
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Single-screw 25,000-B.H.P. tanker
Engineering Index Backfile | 1961
Single-screw motor tanker "Grena"
Engineering Index Backfile | 1950
Single-screw motor tanker "Grena"
Engineering Index Backfile | 1950
Single-screw motor tanker "Vigrid"
Engineering Index Backfile | 1932
Modern 26,500 SHP steam tanker power plant
Engineering Index Backfile | 1966
|