New contact wire is being strung on electrified section of Erie Railroad from Rochester to Mt. Morris, N. Y. Type of equipment used, traffic experience in catenary design, etc. See also Ry. Elec. Engr., vol. 14, no. 7, July 1923, pp. 195-198, 11 figs.
Erie replaces steel contact wire with bronze
Ry. Age
Railway Age ; 74 , n 30
1923
4 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Digital By-Wire Replaces Mechanical Systems in Cars
SAE Technical Papers | 2004
|Digital By-Wire Replaces Mechanical Systems in Cars
British Library Conference Proceedings | 2004
|Digital by-wire replaces mechanical systems in cars
Automotive engineering | 2004
|Norman Wells field replaces steel flowlines with fiberglass
Tema Archive | 2005
|New Lock Washer Technology Replaces Safety Wire in Many Applications
SAE Technical Papers | 1998
|