New contact wire is being strung on electrified section of Erie Railroad from Rochester to Mt. Morris, N. Y. Type of equipment used, traffic experience in catenary design, etc. See also Ry. Elec. Engr., vol. 14, no. 7, July 1923, pp. 195-198, 11 figs.
Erie replaces steel contact wire with bronze
Ry. Age
Railway Age ; 74 , n 30
1923
4 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Digital By-Wire Replaces Mechanical Systems in Cars
SAE Technical Papers | 2004
|Digital by-wire replaces mechanical systems in cars
Kraftfahrwesen | 2004
|Digital By-Wire Replaces Mechanical Systems in Cars
British Library Conference Proceedings | 2004
|Norman Wells field replaces steel flowlines with fiberglass
Tema Archiv | 2005
|Welded steel railroad trestle replaces wooden structure
Engineering Index Backfile | 1939
|