About 400,000 pounds sterling in all are being expended on construction of first unit of grain-handling equipment, capacity of 2,500,000 bu. being provided at outset; elevator will be able to accommodate three grain vessels at one time along 1500-ft. dock frontage.
Harbour works at Churchill, Manitoba
Engineering
Engineering ; 130 , n 3386
1930
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Churchill harbour terminus of the Hudson bay railway
Engineering Index Backfile | 1929
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1935