Work on Chesapeake and Ohio at Ona, W. Va.; elimination of 1400-ft. tunnel by means of 600,000-yd. open cut.
Moving 600,000 cubic yards of material to eliminate a railway tunnel
Eng. Contracting
Engineering and Contracting ; 68 , n 7
1929
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Automation railway marshalling yards
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1896
|Engineering Index Backfile | 1896
|