Discussion of unusual methods employed in Jacksonville terminal for renewing five crossing tracks in 6 1/4 hours; traffic makes crossing renewal a problem; crossings assembled in materials yard; multiple trucks transported assembled crossings; no hoisting equipment used.
Speeding up special trackwork renewal in a busy terminal
Ry. Eng. Maintenance
Railway Engineering and Maintenance ; 25 , n 12
1929
3 pages
6 Figs.
Article (Journal)
English