System of signaling and remote control power switches on complete division between Grafton, W. Va., and Parkersburg, 102 mi.; between these points all train movements are being directed by signal indication without written train orders; illustrated description of system. (See also Ry. Signaling vol. 22, no. 9, Sept. 1929 pp. 323-326, 9 figs)
Trains on Baltimore and Ohio operate by signal indication over single-track lines
Ry. Age
Railway Age ; 67 , n 9
1929
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trains on Baltimore and Ohio operate by signal indication over single-track lines
Engineering Index Backfile | 1929
|New streamlined trains, Baltimore and Ohio railroad
Engineering Index Backfile | 1935
Baltimore and Ohio light-weight passenger trains
Engineering Index Backfile | 1935
Baltimore and Ohio light-weight passenger trains
Engineering Index Backfile | 1935
Three air-conditioned trains operated by Baltimore and Ohio
Engineering Index Backfile | 1931