Mar 1929 n 3 p 73-78.: Maintenance department of Central Railroad of New Jersey is equipped to care for five different systems of train control; maintenance methods are described; inspection tests and reports. Apr 1929 n 4 p 117-121: Some locomotives are equipped with both three-speed loop and coded continuous automatic train-control systems; systems of train control; change made from one to other by throwing switch; equipment and wiring diagram of composite system; testing and performance.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Train control maintenance on the Central Railroad of New Jersey


    Additional title:

    Ry. Elec. Engr


    Published in:

    Publication date :

    1929


    Remarks:

    18 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English