Description of rail brake which was in operation in Hamm yard of German State Railways, and was applied to Whitemoor yard of London and North Eastern Railway; rail brake consisted of table supported on hydraulic cylinders by which it can be raised 4 3/4 in.; method of working layout of yard; control tower. (see also - discussion p 346-350; Modern Transport, vol. 21, nos. 522 and 533, Mar. 16 and June 1, 1929, pp. 3-4 and 10-11, 13 figs. and (discussion), no. 523, Mar. 23, pp. 9-10)
The Froelich hydraulic transport wagon brake at March concentration yard
Inst. Transport -- Jl. (Lond.)
Institute of Transport -- Journal (London) ; 10 , n 7
1929
7 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Froelich hydraulic transport wagon brake at March concentration yard
Engineering Index Backfile | 1929
|The Froelich hydraulic wagon brake on the L.N.E.R
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1931
Automated wagon marshalling yard
Engineering Index Backfile | 1965