Description of rail brake which was in operation in Hamm yard of German State Railways, and was applied to Whitemoor yard of London and North Eastern Railway; rail brake consisted of table supported on hydraulic cylinders by which it can be raised 4 3/4 in.; method of working layout of yard; control tower. (See also - no. 533 June 1 p 3-4 and (discussion) no. 523, Mar. 23, pp. 9-10; Inst. of Transport -- Jl. (Lond.), vol. 10, no. 7, May 1929, pp. 339-345, and discussion p 346-350, 3 figs.)
The Froelich hydraulic transport wagon brake at March concentration yard
Modern Transport
Modern Transport ; 21 , n 522
1929
2 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Froelich hydraulic transport wagon brake at March concentration yard
Engineering Index Backfile | 1929
|The Froelich hydraulic wagon brake on the L.N.E.R
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1931
Automated wagon marshalling yard
Engineering Index Backfile | 1965