San Antonio Public Service Co. completes extensive track reconstruction work at night to eliminate traffic delays; equipment and materials; construction methods; clips are welded to steel ties; rails were thermit welded and ground off with Atlas rail grinder. (see also Traction Shop and Roadway, vol. 2, no. 9, Sept. 1929, pp. 268-269, 3 figs)
Track construction at night
Elec. Traction
Electric Traction ; 25 , n 1
1929
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Parallel Track Tactics for Night Attack
NTIS | 1988
|Engineering Index Backfile | 1914
|