San Antonio Public Service Co. completes extensive track reconstruction work at night to eliminate traffic delays; equipment and materials; construction methods; clips are welded to steel ties; rails were thermit welded and ground off with Atlas rail grinder. (see also Traction Shop and Roadway, vol. 2, no. 9, Sept. 1929, pp. 268-269, 3 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Track construction at night


    Additional title:

    Elec. Traction


    Contributors:
    Botto, L.T. (author)

    Published in:

    Publication date :

    1929


    Size :

    3 pages


    Remarks:

    4 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Track construction at night

    Botto, L.T. | Engineering Index Backfile | 1929


    Night track reconstruction

    Engineering Index Backfile | 1929


    Night track reconstruction

    Engineering Index Backfile | 1929



    Track construction

    Schreiber, Martin | Engineering Index Backfile | 1914