San Antonio Public Service Co. completes extensive track reconstruction work at night to eliminate traffic delays; equipment and materials; construction methods; clips are welded to steel ties; rails were thermit welded and ground off with Atlas rail grinder. (See also Elec. Traction vol. 25, no. 1, Jan. 1929 pp. 33-35, 4 figs)
Track construction at night
Traction Shop Roadway
Traction Shop and Roadway ; 2 , n 9
1929
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Parallel Track Tactics for Night Attack
NTIS | 1988
|Engineering Index Backfile | 1898
|